On set it is not power that decides but silence: a generator forty metres behind the subject is on the audio track. Then there is the location itself — flats, basements, stairwells where a combustion unit simply does not run.
What gets planned differently on set
Separate sound from light. Camera, radio links, mixer and DIT are small, sensitive loads; lamps are large and abrupt. Two circuits stop a lamp change from taking the audio with it.
Calculate in shooting days, not hours. What counts is the energy for one day including reserve for the last take — not peak power.
Check the location first. Indoors and in dense courtyards a generator is not only loud but often prohibited; the permit decides earlier than the budget.
Plan transport in. A storage unit is carried by two people and travels in the van — that changes how many location moves are possible in a day.
From a small setup to a night shoot
One unit: camera, radio links, monitor, mixer and a small LED — the case for documentary and interview.
Two units in parallel: light and sound separated, plus reserve for the extension that always comes on set.
Three units plus distribution: 400 V for larger lamps and ballast, spread across three storage units.
P-series parallel power systems
One modular platform. Add parallel units where the load grows — two or three units single-phase, or three units for 400 V three-phase.
Configuration
Units
Rated power
Usable capacity
Weight
Output
P25
1
2,500 W
2.7 kWh
29 kg
230 V / 16 A · single-phase
P25 + P25-D
2
5,000 W
5.4 kWh
≈60 kg
230 V · single-phase · AC230V/20A output
P25 + P25-D
3
7,500 W
8.1 kWh
≈90 kg
230 V · single-phase · AC230V/30A output
P25 + P25-T
3
7,500 W
8.1 kWh
≈90 kg
400 V · three-phase · AC400V/10A output
P25
Units
1
Rated power
2,500 W
Usable capacity
2.7 kWh
Weight
29 kg
Output
230 V / 16 A · single-phase
P25 + P25-D
Units
2
Rated power
5,000 W
Usable capacity
5.4 kWh
Weight
≈60 kg
Output
230 V · single-phase · AC230V/20A output
P25 + P25-D
Units
3
Rated power
7,500 W
Usable capacity
8.1 kWh
Weight
≈90 kg
Output
230 V · single-phase · AC230V/30A output
P25 + P25-T
Units
3
Rated power
7,500 W
Usable capacity
8.1 kWh
Weight
≈90 kg
Output
400 V · three-phase · AC400V/10A output
Wiring
The parallel distribution unit carries one power input and one data input per battery unit, and a single output to the load.
AC230V/20ATwo P25 units, 230 V single-phase.
AC230V/30AThree P25 units, 230 V single-phase.
AC400V/10AThree 230 V P25 units in parallel make 400 V three-phase — all three required, or the system loses a phase.
How the parallel link is wired
Each P25 runs one power cable and one data cable to its own input pair on the distribution unit.
The distribution unit has three input pairs (L1 / L2 / L3); one pair per battery unit.
Only the distribution unit output feeds the load. Battery units are never connected to the load directly.
Each unit keeps its own protective device; no unit back-feeds another.
Three configurations, one platform
Start with a single unit and add parallel units only when the load demands it. Every configuration runs the same battery unit and the same distribution unit.
P25
The core unit. A fanless, self-cooling 230 V power station that replaces the combustion generator on site — no exhaust, no idling noise, no fuel run.
Two or three units linked through the parallel distribution unit for 230 V single-phase loads. Power and capacity stack — start with two, add a third when the job needs it.
Three 230 V P25 units in parallel produce the 400 V three-phase supply that runs tools which will not start on single phase. All three are required — remove one and the system loses a phase. Carried and assembled by hand: no crane, no lifting gear.
The questions buyers actually ask before a first order — answered with numbers from our own datasheets, not from a brochure.
Why no generator on set?
Because it ends up on the audio track, and because at many locations — flats, basements, stairwells — a combustion unit may not be operated at all. Both decide earlier than the budget.
How much energy does a shooting day need?
Calculate in shooting days, not hours: loads times planned runtime, plus reserve for the extension that almost always comes. Peak power alone helps little on set.
Is one unit enough for light and sound?
Technically often yes, practically separation is better: a lamp change should not take the audio with it. Two circuits or two units keep the set quiet.
Can I recharge during the shoot?
Only between setups, not during a take. Plan reserve for the whole day instead of relying on top-ups.