Emergency response

Outage sites, incident command, search-and-rescue lighting.

Starting configuration: P25-D · P36

After an outage, the first hour decides what a site can do: command, communications and lighting need power now. P25-D, two units in parallel at 5 kW / 5.4 kWh, keeps communications and lighting online together; P36, 3.6 kW at 21–23 kg, stays in reserve for the heavy equipment. Fan-less self-cooling delivers the moment you close the switch — no warm-up, no fuel, no exhaust in a semi-enclosed site. A single unit at 29 kg is in position with a two-person carry team in minutes.

A Hitama portable storage unit deployed at an emergency response site

Field notes in this sector

  • Emergency response

    The drying starts while the consumer unit is still off

    A flooded building is dried long before it is reconnected, and that gap is a power problem: a small load that has to run for days in an empty, sealed building. This is how to size for it from rating plates and hours, without guessing.