Load first, equipment second
Count the tools that run at the same time, not the ones sitting in the yard.
Read the input power off each rating plate and add them up.
Add 20 to 30 percent headroom. Motors and compressors draw several times their rated current when starting.
Check whether any equipment needs 400 V three-phase. That decides the configuration, not a bigger single-phase unit.
One unit, two units, three units
A single unit covers hand tools and lighting at moderate load, and one person can carry it.
Two units in parallel double both output and usable capacity — the usual step when cutters and other loads run together.
Three units in a three-phase bank deliver 400 V for equipment that will not start without it, and spread the load across three enclosures.
P-series parallel power systems
One modular platform. Add parallel units where the load grows — two or three units single-phase, or three units for 400 V three-phase.
Configuration
Units
Rated power
Usable capacity
Weight
Output
P25
1
2,500 W
2.7 kWh
29 kg
230 V / 16 A · single-phase
P25 + P25-D
2
5,000 W
5.4 kWh
≈60 kg
230 V · single-phase · AC230V/20A output
P25 + P25-D
3
7,500 W
8.1 kWh
≈90 kg
230 V · single-phase · AC230V/30A output
P25 + P25-T
3
7,500 W
8.1 kWh
≈90 kg
400 V · three-phase · AC400V/10A output
P25
Units
1
Rated power
2,500 W
Usable capacity
2.7 kWh
Weight
29 kg
Output
230 V / 16 A · single-phase
P25 + P25-D
Units
2
Rated power
5,000 W
Usable capacity
5.4 kWh
Weight
≈60 kg
Output
230 V · single-phase · AC230V/20A output
P25 + P25-D
Units
3
Rated power
7,500 W
Usable capacity
8.1 kWh
Weight
≈90 kg
Output
230 V · single-phase · AC230V/30A output
P25 + P25-T
Units
3
Rated power
7,500 W
Usable capacity
8.1 kWh
Weight
≈90 kg
Output
400 V · three-phase · AC400V/10A output
Wiring
The parallel distribution unit carries one power input and one data input per battery unit, and a single output to the load.
AC230V/20ATwo P25 units, 230 V single-phase.
AC230V/30AThree P25 units, 230 V single-phase.
AC400V/10AThree 230 V P25 units in parallel make 400 V three-phase — all three required, or the system loses a phase.
How the parallel link is wired
Each P25 runs one power cable and one data cable to its own input pair on the distribution unit.
The distribution unit has three input pairs (L1 / L2 / L3); one pair per battery unit.
Only the distribution unit output feeds the load. Battery units are never connected to the load directly.
Each unit keeps its own protective device; no unit back-feeds another.
Three configurations, one platform
Start with a single unit and add parallel units only when the load demands it. Every configuration runs the same battery unit and the same distribution unit.
P25
The core unit. A fanless, self-cooling 230 V power station that replaces the combustion generator on site — no exhaust, no idling noise, no fuel run.
Two or three units linked through the parallel distribution unit for 230 V single-phase loads. Power and capacity stack — start with two, add a third when the job needs it.
Three 230 V P25 units in parallel produce the 400 V three-phase supply that runs tools which will not start on single phase. All three are required — remove one and the system loses a phase. Carried and assembled by hand: no crane, no lifting gear.
Technical data, conformity and transport conditions are in the datasheet. To size a system for your case we need three things: where it is used, which tools it runs, and whether three-phase is required.
The questions buyers actually ask before a first order — answered with numbers from our own datasheets, not from a brochure.
What distinguishes a jobsite power station from a diesel generator?
It burns nothing: no exhaust at the point of use, no engine noise, no refuelling. That makes it suitable for interiors, tunnels, trenches and night work — cases where a combustion unit may not even be placed.
Which loads typically run on a construction site?
Lighting, hand tools, extraction, chargers and electronics form the base. Welding sets, compressors and water pumps come on top when starting current and voltage match — with three-phase loads, configuration decides, not size.
How do I size the system?
Count the loads that run simultaneously, add their input ratings, and plan 20 to 30 percent reserve for starting currents. The number of tools standing on site is the wrong basis.
Can the system be expanded later?
Yes, through parallel operation. A second unit is added instead of replacing the first — the cheaper strategy for rental, because the base equipment stays in the fleet.