Austria's regulator E-Control reports an average outage duration of 23.41 minutes per connected customer for 2024 — down from 32.27 minutes in 2023. That is 27.5 percent less. For the site manager, the figure is still no blanket reassurance.

What the number actually measures

E-Control publishes "unplanned customer-related unavailability", calculated as SAIDI. It is an annual total per connected end consumer, averaged across the entire grid area. It answers one question: how long was an average customer off the grid during the year?

It does not answer the question that matters on site: what happens at this connection, on this day?

The regulator also names a reason for the decline that has nothing to do with construction sites: a lower impact of ordinary atmospheric events during the reporting year. A good year is not a rebuilt grid.

Source: E-Control, Newsletter 4/2025 – "Wie zuverlässig ist unsere Versorgung mit Strom und Gas?" → e-control.at

Three failures that appear in no SAIDI figure

A site power failure rarely has the cause people assume. Three everyday cases:

1. There is no connection yet. In new-build work the grid connection is often the last trade on site, not the first. Nobody bridges that gap with an annual statistic.

2. The distribution board is there, the cable is not. Site distribution board and supply cable are two separate dates. Plan only the board and you have power up to the cabinet and not a metre further.

3. The connection exists, the load was not foreseen. When mixer, heater and circular saw run at the same time, the question is not "how reliable is the grid" but "what is connected at the same time".

Only the third can be planned without waiting for anyone: a list of loads, their starting currents, and a decision about what drops out first.

What follows for procurement

If outage duration falls — 23.41 after 32.27 minutes — the justification for equipping every site with a large diesel machine by default falls with it. What remains is a narrower question: which loads must not fail, and for how long?

That question can be answered with three inputs and no statistics: which devices, which rating, which duration. Those who can answer it often need less machine than they thought — and place it where it actually takes effect.

> We sell the backup. That is why we also say when it is not needed: a good grid connection does not replace a battery, but it makes it smaller.

Technical data for units used on site is published under power station for construction sites.

Engineered in Germany.