With a rental fleet, the first delivery is not what decides. It decides the first job only. What decides over the years is the second delivery – and whether it still connects to the first.
Anyone buying three units today buys the fourth in two years. Between those two orders sit tenders, a new site manager, perhaps a change to the housing. And that is exactly where the damage appears that no tender document mentions: the fourth unit can no longer be combined with the first three into one supply. One fleet becomes two fleets that cannot be mixed. From then on, every dispatch carries a list of which unit is allowed on which job.
Technically this is a question of the connection panel, not of the cell. The P25 delivers 2,500 W rated at 230 V and 16 A, single-phase, with 2.7 kWh usable capacity. Peak output 5,000 W, specified for at most 10 seconds. The P25-D distribution unit combines two or three units into one 230 V supply: two units give 5,000 W and 5.4 kWh, three give 7,500 W and 8.1 kWh, and peak output rises to up to 15,000 W in the same 10-second window. The output stays 230 V at 16 A at every stage. That constancy is the point: power grows with the units, the connection does not grow with them.
So what does that mean for purchasing? A 16 A socket at 230 V is a commitment for one workplace, not for a crew. Anyone needing more power gets it through the parallel configuration – but still as one 230 V supply, not as three-phase. For three-phase loads there is the P25-T with 400 V. Whoever writes "400 V" in a quote and ships a P25 sells a property the unit does not have.
That is why our own documentation contains a question that sounds like a formality and is not: have it confirmed that re-orders remain combinable with the first delivery and do not switch to a new series generation. That is not insurance against bad luck. It is the only assurance that holds a fleet together across five years.
Three things that are regularly overlooked here.
First, weight. 29 kg per unit is calculated for vans, lifts and stairwells – not for the sum of a parallel configuration. For transport, the weight per unit is what counts, because nobody carries three units down the stairs at once.
Second, runtime. 2.7 kWh is usable, not nominal. Actual runtime sits below that, because inverter losses and the discharge limit come on top; in cold it drops further. Anyone wanting to cover a full shift plans with half and includes the second unit. That is unpleasant to hear and cheaper than a resupply halfway through.
Third, cooling. The build is fanless: no intake duct, no moving parts in the cooling circuit, protection rating IP54. On demolition and grinding sites that is not a comfort detail. Dust, lime and grinding particles find no inlet because there is none – and a bearing that is not aspirated cannot clog.
We build the units ourselves, on the same line, with the same connection panel. That is why we can make a statement about re-order compatibility at all: it is not dealer information that changes from batch to batch. What we do not promise is a quantity – that depends on your equipment list, and only you know it.
So the question before the first order is not "how many watts?" but: does the second delivery still connect to the first? Whoever settles that beforehand ends up with one fleet. Whoever settles it afterwards ends up with two.
Send us your equipment list – we will dimension the configuration and tell you which stage covers your trades.